VALIDATOR LICENSE SALE — TIER 1 NOW OPEN
/// NETWORK STATUS: ACCEPTING VALIDATORS

The Shock Absorber
For The Grid.

We develop utility-scale battery storage that captures excess solar generation and delivers reliable, dispatchable power to the Texas grid. Validators fund early-stage development—land, engineering, permits—and serve as the decentralized verification layer for real grid data and project milestones.

This isn't passive income.

By partnering with ReDewable.Energy, you're building the grid's oracle energy network.

REAL INFRASTRUCTURE // ACTIVE VALIDATORS // DePIN
VALIDATOR TERMINAL CONNECTION: SECURE
TIER 1 (GENESIS) 2.5 SOL ~160 kW NETWORK EQ.
-- / 1000 AVAILABLE
TIER 2 (CORE) 3.5 SOL ~160 kW NETWORK EQ.
🔒 LOCKED
TIER 3 (SURGE) 4.5 SOL ~160 kW NETWORK EQ.
🔒 LOCKED
FUNDS COMMITTED
USD
-- / --
⚠️ UNDERSTAND BEFORE YOU MINT This is a software license, not an investment. You are NOT buying equity, debt, or any claim on company assets. Tokens may have zero value. Active participation is required. You could lose everything. Only use funds you can afford to lose.
NEW TO CRYPTO? START HERE →
KYC REQUIRED SIGNED VENDOR AGREEMENTS
ASSET CLASS400MW BESS
GRID NODEERCOT WEST
LIVE SITE FEEDCAMERA + SENSORS
STATUSPRE-NTP
01 // THE THESIS

WHY BATTERIES MATTER

SOLAR
BATTERY
GRID

The Grid Is Maxed Out

Drained battery

Texas power demand will grow 70% by 2031—driven by AI data centers. Add extreme weather (deep freezes, heat waves), and the grid faces collapse. Batteries absorb the shock, storing cheap solar energy and releasing it when demand spikes.

The Problem: Not enough storage to meet growing demand.

Data Centers Need Stability

Charging battery

Texas Senate Bill 6 now requires data centers to disconnect during grid emergencies. AI training can't pause mid-run—that destroys expensive compute jobs. Battery storage provides the frequency response that keeps voltage stable and operations online.

The Solution: Batteries deploy faster than new power lines.
Our Role: Our Role: We specialize in early-stage development—preparing shovel-ready sites for institutional deployment.
02 // USE OF FUNDS

WHERE THE MONEY GOES

We develop sites to "Shovel-Ready" (NTP) status—land secured, permits filed, engineering complete. Large operators deploy capital at construction scale; we specialize in the early-stage groundwork that prepares projects for institutional investment.

USD
Engineering & Geotech (ANS)$213,000
Grid Interconnection (Enerzinx)$50,000
ERCOT Filing Package$150,000
PACE Financing Prep$25,000
Legal & Compliance$100,000
Land Acquisition$200,000
Operations & Contingency$262,000
TOTAL RAISE$1,000,000

THE VALIDATION CYCLE

How validators build the oracle network:

1. Get License: Mint a Validator License (NFT)
2. Verify Data: Review ERCOT grid data & milestones
3. Sign Attestation: On-chain signature confirms accuracy
4. Claim Rewards: Active validators receive $RDW
VENDORS & SERVICE PROVIDERS (SIGNED AGREEMENTS)
03 // THE ASSET

REDEW ANSON — FLAGSHIP SITE

Strategic Location

LOCATIONANSON, TX
GRID ZONEERCOT WEST
CORRIDORSTARGATE
CAPACITY400 MW

Located in West Texas near massive solar farms in the "Stargate Corridor." When solar over-generates, prices crash (sometimes negative). Batteries charge cheap. When the sun sets and demand spikes, batteries discharge at premium rates.

>> Anson is the flagship — future sites will be sourced via validator scouting (US + global).
>> LAND UNDER OPTION

Development Pipeline

SITE 01 (ANSON)ACTIVE
SITE 02 (WEST)SCREENING
SITE 03 (COAST)NEGOTIATION
SITE 04 (NORTH)PROSPECTING
SITE 05 (SOUTH)PROSPECTING
ANSON PROGRESS
Land Secured100%
Vendor Contracts100%
EngineeringPENDING
ERCOT FilingPENDING
ANSON, TEXAS — LIVE CAMERA + WEATHER FEED
CONNECTING...
STREAM: OFFLINE PTZ CAMERA — COMING SOON
Temperature -- °F
Solar Irradiance -- W/m²
Wind Speed -- mph
Humidity --%
Wind Direction --
Last Updated --:--:-- --
DATA SOURCE: OPEN-METEO API • COORDS: 32.755843, -99.896823 DAVIS VANTAGE PRO2 — COMING SOON
04 // WHAT VALIDATORS DO

BUILD THE GRID ORACLE NETWORK

Validators verify real data and sign on-chain attestations. You're helping build a decentralized network for energy infrastructure—not just clicking buttons.

Coming Soon: Global site scouting + PPA off-taker identification. Validators help expand globally.

Time commitment: ~5 minutes per month. Real work, not busy work.

VERIFY
GRID DATA
SIGN
ATTESTATION
CLAIM
REWARDS

WHAT'S REQUIRED

Monthly: Check grid data and sign your attestation
Monthly: Verify live site security & conditions (camera + sensors)
Random (20%): Provide proof you verified the source
Quarterly: Vote on a network governance proposal
Yearly: Renew your license (free, takes seconds)
DATA YOU'LL CHECK:
ERCOT Pricing
Queue Position
Engineering Progress
Site Sensor Data
Site Camera Feed

Miss something? Rewards pause until you catch up. Spot an error? Flag it and earn bonus points.

05 // THE PATH

FROM FUNDING TO NTP

PHASE 00 // COMPLETE

FOUNDATION SECURED

> Land option executed
> Vendor contracts signed
> Sensors deployed at site
> Legal structure established
PHASE 01 // NOW

VALIDATOR RAISE

> Launch Validator License Sale
> Fund land acquisition + legal
> Begin engineering + ERCOT filing
> Deploy live PTZ camera + weather station at Anson site
PHASE 02 // PRE-DEVELOPMENT

BUILD THE FOUNDATION

> Exercise land option
> Submit ERCOT package
> Complete geotech + engineering
PHASE 03 // TOKEN LAUNCH

$RDW GOES LIVE

> Token Generation Event
> Validator rewards activated
> Open market trading begins
PHASE 04 // EXIT

NTP SALE

> Project reaches "Shovel Ready"
> Sale to institutional buyer
> DAO votes on treasury allocation
PHASE 05 // SCALE

NETWORK EXPANSION

> Deploy capital to Site 02+
> Grow validator network
> Repeat development cycle
06 // TOKEN ALLOCATION

$RDW DISTRIBUTION

VALIDATOR REWARDS30%
Distributed to active validators over 36 months.
RWA RESERVE25%
Backed by physical asset development.
TREASURY15%
DAO-governed. All allocations by vote.
TEAM15%
1-year cliff, 3-year vesting.
ECOSYSTEM10%
Grants & integrations.
LIQUIDITY5%
Initial DEX liquidity.
THE OPERATOR

TALOR BYINGTON

10+ years operational leadership. Built and scaled physical businesses. Now bridging real-world energy infrastructure with decentralized networks.

@TALORMAYDE